Facility

Facilities for mould test, process optimisation and validation include:

  • 5 comprehensively equipped injection moulding machines ranging in clamp force from 50 Tonne to 240 Tonne
  • Mould temperature and hot runner controllers
  • 5 Tonne gantry
  • 3-axis robots, desiccant dryers, conveyors etc
  • Metrology:
    • Coordinate¬†Measuring (IMS) and Non-Contact¬†Optical Measuring (OGP Smartscope) machines
    • In-house design and manufacture of Metrology Fixtures¬†

Avenue Mould Cleanroom